Transmission Network Investment as an Anticipation Problem


Advanced Search

Browse

My Account

Statistics

Transmission Network Investment as an Anticipation Problem

Show full item record

Title: Transmission Network Investment as an Anticipation Problem
Author: RIOUS, Vincent; GLACHANT, Jean-Michel; DESSANTE, Philippe
Subject: Liberalised power system; Transmission Network; Planning; Investment; Anticipation
Date: 2010
Series/Report no.: EUI RSCAS; 2010/04; Loyola de Palacio Programme on Energy Policy
Abstract: This paper proposes a probabilistic model to evaluate if a proactive TSO that anticipates the connection of new generators with short construction duration compared to the time needed to reinforce the network is more efficient than a reactive TSO that does not make any anticipation but that may then face higher congestion while the network is being reinforced. This evaluation is made in presence of anticipation costs both related to the study of the project of network investment and to the administrative procedures needed to obtain the building agreement. Our results in terms of social costs clearly show a limit of probability for the connection of generators beyond which a proactive TSO is more efficient than a reactive TSO. Evaluated on realistic cases of connection, this limit of probability is found quite low, which indicates that the proactive behaviour for a TSO shall generally be the optimal one.
URI: http://hdl.handle.net/1814/13081
ISSN: 1028-3625
Table of Contents: null

Files in this item

Files Size Format View
RSCAS_2010_04.pdf 836.7Kb PDF View/Open

This item appears in the following Collection(s)

Show full item record