Open Access
The EU electricity network codes (2019 ed.)
Loading...
Files
FSR_2019_EU_Electricity_Network_Codes.pdf (9.02 MB)
Full-text in Open Access
License
Cadmus Permanent Link
Full-text via DOI
ISBN
ISSN
Issue Date
Type of Publication
LC Subject Heading
Other Topic(s)
EUI Research Cluster(s)
Initial version
Published version
Succeeding version
Preceding version
Published version part
Earlier different version
Initial format
Citation
Florence School of Regulation; 2019; Energy; Electricity
Cite
SCHITTEKATTE, Tim, REIF, Valerie, MEEUS, Leonardo, The EU electricity network codes (2019 ed.), Florence School of Regulation, 2019, Energy, Electricity - https://hdl.handle.net/1814/61644
Abstract
The EU network codes and guidelines are a detailed set of rules pushing for the harmonisation of national electricity markets and regulations. A total of eight network codes and guidelines entered into force by the end of 2017: three grid connection codes (RfG NC, DC NC and HVDC NC), three market codes (FCA GL, CACM GL and EB GL), and two operation codes (SO GL and ER NC). The major part of this text covers the market codes. The reader is guided through the sequence of electricity markets in place in the EU: forward markets, the day-ahead market, the intraday market and finally the balancing markets. The establishment of these different markets in a national context is discussed and their integration. Additionally, also two connection codes (RfG NC and DC NC) are discussed; the scope of theses codes is described and technical requirements are clarified. Where relevant, the link between the system operation guideline (SO GL) and the market or connection codes is made. In each section, basic market design or more technical concepts are explained, we highlight what is in the codes, and we also refer to some of the relevant academic literature.
Table of Contents
Additional Information
External Links
Publisher
Version
This report is an updated version of ‘’Meeus, L., & Schittekatte, T. (2018). The EU electricity
network codes. FSR Technical report. February 2018.’’